Construction cost glossary: BOQ, QTO and contract terms

Published:

Plain definitions of the terms used in quantity surveying, pricing, planning and contracts, with the Arabic term for each.

Original glossary. Definitions are general; where a contract or a measurement standard defines a term, its definition governs.

Quantities and measurement

Quantities and measurement
TermArabicMeaning
Bill of quantities (BOQ)جدول الكمياتA list of the work as measurable items, each with a description, a unit and a quantity.
Quantity take-off (QTO)حصر الكمياتMeasuring and counting quantities from drawings or models.
Measurement standardمعيار القياسThe rules for measuring items, such as POMI, NRM2 or CESMM.
Preamblesمقدمات جدول الكمياتClauses at the start of a BOQ that define what the rates include.
Provisional sumمبلغ احتياطيAn allowance for work that is not yet defined.
Prime cost sumمبلغ التكلفة الأساسيةAn allowance for goods or work from a nominated supplier or subcontractor.
Dayworkأعمال اليوميةWork paid on time and materials rather than on measured quantities.

Pricing

Pricing
TermArabicMeaning
Unit rateسعر الوحدةThe price for one unit of an item, including everything the item description covers.
Rate analysisتحليل الأسعارThe build-up of a unit rate from labour, materials, plant and subcontract.
Direct costالتكلفة المباشرةThe cost of the resources that go into the work itself.
Site overheads (preliminaries)مصاريف الموقع (البنود التمهيدية)Costs of running the site that belong to no single item.
Head office overheadsمصاريف المكتب الرئيسيThe share of the company’s central costs charged to the project.
ContingencyالاحتياطيAn allowance for risks that are known but not yet priced.
WastageالهالكMaterial lost in cutting, handling and breakage, added to the measured quantity.

Planning

Planning
TermArabicMeaning
Work breakdown structure (WBS)هيكل تجزئة الأعمالThe project divided into areas, stages and packages of work.
Critical pathالمسار الحرجThe chain of activities that sets the finish date.
Floatالفائض الزمنيHow long an activity can slip without delaying the finish.
Baselineخط الأساسThe approved programme that progress is measured against.
XER fileملف XERPrimavera P6’s exchange format for projects, resources and roles.

Contracts and payment

Contracts and payment
TermArabicMeaning
Variationأمر تغييريAn instructed change to the work, valued under the contract’s rules.
Interim payment certificateالمستخلص (شهادة دفع مرحلية)The amount certified as due for a period, usually monthly.
Retentionمحتجزات الضمانA percentage held back from each payment until completion and the end of the defects period.
Advance paymentالدفعة المقدمةA payment at the start of the contract, recovered from later certificates.
Extension of timeتمديد المدةAdditional time granted for a delay the contractor is not responsible for.
Delay damagesغرامات التأخيرThe amount due for late completion, as set in the contract.
Notice of claimإشعار المطالبةThe written notice a contract requires before a claim for time or money.
Particular Conditionsالشروط الخاصةThe project-specific changes to a standard form such as FIDIC.