CAIS Platform

Our Services

Four specialized AI Masters working together to automate your entire construction lifecycle — from quantity take-off through scheduling, pricing, and contract administration.

01

Quantum Take-Off (QTO) Master

Experimental · review required

Quantity take-off from PDF, IFC and CAD DXF for Building, MEP and Infrastructure. DWG, Revit (RVT) and Navisworks (NWC/NWD) require available Autodesk (APS) conversion and cost authorization. Source coverage and quantities need review; independent accuracy validation is pending.

Building QTO Agent

Structural + architectural: foundations, columns, beams, slabs, walls, finishes, doors/windows, waterproofing. 42 sanity checks.

MEP QTO Agent

Electrical, mechanical, and plumbing systems. 22 calculation protocols (AA-VV), 10 MEP sanity checks.

Infrastructure QTO Agent

Roads, drainage, sewerage, water, stormwater, electrical, telecom, gas, landscape. 12 BOQ sections (A-L).

Key Features
Original-page PDF analysis
IFC and declared CAD DXF measurements
Conditional Autodesk conversion: DWG, RVT, NWC/NWD
Explicit measurement policy
Source coverage and unresolved quantities
Excel report for review
Saved result revisions
Email notifications
02

Pricing Master

Production v2.0

Intelligent cost estimation with CWICR rate libraries (55K items), PERT build-ups, 12 QA checks, and FIDIC-compliant priced BOQ. 7 AI phases from normalize to daywork schedule.

Rate Build-Up Engine

PERT analysis: LOW / MOST_LIKELY / HIGH per item. Material, labor, equipment, overhead, and profit breakdown.

CWICR Data Layer

PostgreSQL with 55K+ items: materials, equipment, work items, labor rates, productivity factors.

QA & Reporting

12 deterministic QA checks, 10-sheet Excel output (FIDIC cover, benchmarks, cash flow, trade preambles).

Key Features
PERT rate build-up
CWICR data (55K items)
12 QA validation checks
Country calibration (KSA/EGY/UAE)
10-sheet FIDIC Excel
Daywork schedule (Clause 13.6)
03

Planning Master

Production v3.0

P6-grade construction schedules from BOQ data. WBS, activities, logic links, CPM analysis, resource loading, earned value, and Excel + XER export.

Schedule Generator

WBS creation, activity sequencing, PERT durations, construction strategy, and logic links with CPM analysis.

Resource Engine

Resource loading with crew compositions, resource leveling, and equipment scheduling.

Analytics & Export

Earned value (12 PMI formulas), S-curves, cash flow, delay analysis (TIA), 13-sheet Excel + XER export.

Key Features
BOQ-to-schedule automation
CPM & float analysis
Resource loading & leveling
Earned value (S-curve, banana)
Excel + XER (P6) export
TIA delay analysis
04

Contract Administrator

Production v1.0

Upload contract PDF for AI clause extraction, risk analysis, obligation mapping, and ongoing administration tools. Supports FIDIC Red/Yellow/Silver, NEC4, and JCT with auto-detection.

Contract Analysis

6 AI phases: clause extraction, obligation mapping, risk analysis, payment framework, notice framework, admin tools.

Ongoing Admin

Multi-session API for IPC generation, variation logging, claims tracking, notice alerts, and financial dashboard.

Cross-Master Link

Links contract obligations to QTO quantities, pricing rates, and planning schedules for unified project view.

Key Features
FIDIC / NEC4 / JCT auto-detect
Risk register & scoring
IPC & variation tracking
Notice deadline alerts
10-sheet Excel report
6-country support

Ready to Get Started?

Explore the services with your project data. QTO format availability varies; review source coverage and quantities before use.