AI Scheduling

Construction scheduling from your project scope

For planners and project managers preparing a draft construction programme from BOQ and project inputs. Organise activities, sequencing, calendars and a schedule export for review.

Inputs

Provide the BOQ, start and finish dates, milestones, workweek, location and project structure. Relevant contract, drawing, specification and resource documents help define the scope and constraints when available in your plan.

Outputs

Review the generated work breakdown, activities, durations, relationships and calendars. Available downloads include the schedule workbook and an XER file for supported planning tools. Check the completed job’s available artifacts before choosing a format.

Your review

Validate scope coverage, productivity assumptions, crews, logic, calendar exceptions, critical path and contractual milestones with your planner. An exported file is not an approved baseline; site conditions and incomplete inputs can materially change durations.

Schedule generation requires a signed-in account and available plan allowance. Upload only documents you are authorised to process; relevant excerpts may be processed by AI providers. Review privacy and retention before submission.

Upload
AI Processing
Schedule Ready

Upload BOQ File

Drop your BOQ file here or click to browse

Supports Excel (.xlsx/.xls), PDF, CSV, and JSON

Pro DocumentsPROUpload additional project documents for AI-enhanced scheduling

Upgrade to Pro

Upload contract, drawings, and specs for more accurate AI scheduling

Upgrade Plan

PDF only

Contract PDF with terms, dates, and milestones

PDF only

PDF drawings showing project scope and layout

PDF only

PDF specs with material and quality requirements

How It Works

1

Prepare the scope

Provide the BOQ, project dates, structure and working calendar.

2

Inspect the activities

Check that the generated work breakdown covers the supplied scope.

3

Review programme logic

Validate durations, relationships, calendars and critical path.

4

Check the export

Open the available schedule output and review it before baseline approval.

Accepted Formats

Excel BOQ (.xlsx, .xls)
PDF BOQ (.pdf)
CSV files (.csv)
JSON BOQ data (.json)

Output Includes

Activity list with durations
Work Breakdown Structure (WBS)
Logic links (FS, SS, FF, SF)
Project calendar definition
Risk analysis report